Glendale Groundwater Wells

Client: Sundt Construction
Architect/Engineer: CH2M Hill
Location: Glendale, AZ
Completion Date: 2011
Service: Well Pump
Contract Amount: $776,595
Work Performed: This project was to treat groundwater for arsenic and nitrates so water from the wells could be used for potable water after going through water treatment. Weber provided design and specs assistance along with the installation of 4 each 400 HP vertical line shaft turbine pumps with water flush lubrication. It was critical that the job be completed on time for shutdown during SRP's dry out to keep Zone 4 pressures up.