Freeport McMoran

Client: Arizona Beeman Drilling
Architect/Engineer: Clear Creek Assoc.
Location: Green Valley, AZ
Completion Date: November 2010
Market: Mining
Contract Amount: $88,487
Work Performed: Weber was contracted to install 16 groundwater wells to intercept water from mining operations and reuse. The first 4 wells were drilled by reverse circulation to a depth of about 800 feet with 16" stainless steel casing. The wells were furnished and installed vertical turbine test pumps designed for 800-1000 gpm with a setting of 600 feet. Development, step test and constant rate test was done for 46 hours.

Mining Projects

Freeport McMoran