Roosevelt Irrigation District Well 111

Client: Roosevelt Irrigation District
Architect/Engineer: Synergy
Location: Phoenix, AZ
Completion Date: 2011
Market: Agricultural
Contract Amount: $282,805
Work Performed: This project was to drill a replacement well for the existing RID Well 111. The well was drilled as part of a remediation project to clean up groundwater. The new well was drilled with a cable tool rig, and pull down jacks were installed to advance the casing as the well was constructed. The well is 20