Mesquite Solar Project

Client: Zachary Construction
Architect/Engineer: Zachary Construction
Location: Arlington, AZ
Completion Date: 2011
Market: Industrial
Contract Amount: $68,170
Work Performed: This project was to provide construction water for the Mesquite Power Solar Project by videoing multiple wells and selecting two wells to put back in service. The scope of work included multiple well videos, selecting the two best wells based off casing condition and historical data. The two wells were cable tool brushed and bail, a test pump was installed to establish specific capacity of each well, and temporary pumping equipment was installed.