CR Well #2

Client: Town of Marana
Architect/Engineer: Town of Marana
Location: Marana, AZ
Completion Date: 2008
Market: Municipal
Contract Amount: $147,000
Work Performed: A new municipal production cable tool well. The well construction consisted of a 32" surface borehole with surface pipe that was later extracted during surface seal placement. Final well construction consisted of a 22" borehole that was drilled open hole